WikiHouseAU-Process-BreakingOutComponents-1

Onsite – Floor Section Preparation

Once the CNC cut sheets arrive onsite, the components are easily broken out of the base sheets.

The floor cassettes are prepared first in sections that allow for easy lifting by a small group of people.

WikiHouseAU-Process-FloorCassette-Assembly-1

Preparing the floor cassettes.

They can be self-assembled DIY with minimum workshop training.

WikiHouseAU-Process-FloorCassette-Cladding-1

Cladding the Floor Cassettes

They are assembled to form a structure using the simplest of tools, mallets and pegs.

WikiHouseAU-Process-FloorCassette-Compete-1

A completed floor cassette ready for placement

During erection the floor cassettes become safe working and braced platforms.

Comments are closed.